Set up the PM program
- Build an asset register of equipment to be maintained.
- Assign each asset a unique ID and location.
- Define the PM tasks required for each asset.Base tasks on manufacturer manuals and your organization's procedures.
- Set the interval for each task by time, runtime or usage.
- Schedule PM work orders in your CMMS or calendar.
- Assign tasks to qualified technicians and book downtime.
Prepare for the PM task
- Review the work order, asset history and manuals.
- Gather the required parts, consumables and special tools.
- Confirm spares are on hand before starting.
- Notify operations of planned downtime.
- Apply lockout/tagout and follow safety procedures.
- Wear the required personal protective equipment.
Inspection and condition checks
- Inspect for wear, leaks, corrosion, noise and vibration.
- Check belts, bearings, seals and moving parts.
- Record temperatures, pressures and other key readings.
- Compare readings against normal operating ranges.
- Test safety devices, guards and emergency stops.
- Note any developing faults for follow-up.
Service tasks
- Clean equipment, filters, vents and cooling systems.
- Lubricate components per the lubrication schedule.
- Check and top up or change fluids as required.
- Tighten fasteners and check alignment and tension.
- Replace wear parts at their planned life.
- Test the asset under normal operating conditions after service.
Calibration and parts
- Calibrate instruments and gauges to specification.Use traceable standards where required by your procedures.
- Record calibration results and next due dates.
- Log all parts and materials used on the work order.
- Update spare parts stock levels and reorder points.
- Tag failed or replaced parts for inspection or disposal.
- Flag obsolete parts that need a sourcing plan.
Records and review
- Complete and close the work order in the CMMS or log.
- Record the date, technician and time taken.
- Raise follow-up work orders for issues found.
- Track downtime, costs and recurring failures by asset.
- Review PM intervals and tasks against actual results.
- Adjust the schedule to improve reliability over time.
0 / 36 done