Preparation and Identification
- Confirm the equipment has a documented energy control procedure.
- Identify all energy sources: electrical, mechanical, hydraulic, pneumatic, thermal and chemical.
- Locate every energy-isolating device for the equipment.Stored energy such as springs and capacitors must also be identified.
- Verify the authorized employee is trained for this equipment.
- Notify all affected employees before shutting the equipment down.
Shutdown and Isolation
- Shut down the equipment using its normal stopping procedure.
- Operate each energy-isolating device to isolate the equipment.
- Confirm valves, breakers and disconnects are in the safe position.
- Block or restrain any parts that could move under stored energy.Do not rely on control switches alone to isolate energy.
- Isolate connected lines carrying gas, steam or fluids.
Locking and Tagging
- Apply a personal lock to each energy-isolating device.
- Attach a tag identifying the worker, date and reason for lockout.
- Confirm each authorized worker applies their own lock for group work.
- Use a lockout hasp or group lockbox when multiple locks are needed.Each worker must control their own lock and key.
- Verify locks and tags are durable, standardized and clearly marked.
Release Stored Energy and Verify
- Release or restrain residual and stored energy safely.
- Bleed pressure, discharge capacitors and dissipate thermal energy.
- Attempt to start the equipment with controls to confirm isolation.
- Return controls to off after the test.Verify zero energy with the appropriate instrument before contact.
- Confirm a zero-energy state before any work begins.
Servicing and Restoration
- Perform the maintenance with locks and tags in place.
- Confirm the work area is clear of tools and personnel before restart.
- Verify guards and safety devices are reinstalled.
- Remove each lock only by the worker who applied it.
- Notify affected employees before re-energizing the equipment.
- Re-energize and test the equipment for safe operation.
Program and Records
- Confirm machine-specific procedures are written and accessible.
- Verify authorized and affected employees are trained and retrained as needed.
- Check that periodic inspections of the LOTO program are documented.
- Confirm contractors follow a coordinated energy control procedure.
- Important: this is general guidance only and does not replace OSHA regulations, formal training or your employer's energy control procedures; confirm requirements with a qualified person.