Final cleaning
- Remove all construction debris and waste.
- Clean floors, surfaces and fixtures throughout.
- Wash interior and exterior windows.
- Wipe down cabinets, counters and millwork.
- Clean and test plumbing fixtures and appliances.
- Remove labels, protective film and packaging.
Final inspections
- Schedule and pass all code-required final inspections.
- Confirm the certificate of occupancy is obtained.
- Conduct an internal quality walkthrough.
- Verify accessibility and life-safety compliance.
- Check fire protection and alarm systems.
- Document inspection results and approvals.Occupancy approval depends on your authority having jurisdiction; confirm requirements early.
Systems testing and commissioning
- Test and balance HVAC systems.
- Verify electrical systems and emergency power.
- Confirm plumbing operates without leaks.
- Test controls, automation and building systems.
- Verify fire and life-safety systems function.
- Record commissioning results and settings.
Documentation
- Collect as-built drawings and updated plans.
- Gather warranties for systems and materials.
- Compile operation and maintenance (O&M) manuals.
- Assemble inspection and test reports.
- Collect product data sheets and certifications.
- Organize permits and approval records.
Deficiency review
- Walk the building and create the final punch list.
- Prioritize deficiencies by impact and urgency.
- Assign each item to the responsible trade.
- Track corrections to completion.
- Re-inspect resolved items.
- Document sign-off on completed deficiencies.
Handover preparation
- Prepare keys, access cards and codes.
- Schedule the owner walkthrough.
- Plan systems and equipment training for the owner.
- Assemble the closeout and warranty package.
- Confirm outstanding items and timelines.
- Prepare the final account and payment documents.
0 / 36 done