Site and foundation
- Verify site grading, drainage and erosion controls.
- Check excavation depth, soil conditions and compaction.
- Confirm footing dimensions, rebar size and placement.
- Inspect formwork alignment, bracing and dimensions.
- Verify foundation waterproofing and damp-proofing.
- Check anchor bolts and embedded items before the pour.Confirm a code-required foundation inspection is passed before backfilling.
Structural framing
- Verify framing members match the structural drawings.
- Check stud, joist and rafter spacing and sizing.
- Confirm headers, beams and load paths are correct.
- Inspect connections, fasteners and hardware.
- Check that openings are framed to plan dimensions.
- Verify the structure is plumb, level and square.
Mechanical, electrical and plumbing rough-in
- Confirm electrical rough-in, boxes and wire gauge match plans.
- Pressure-test and inspect plumbing supply and drain lines.
- Verify HVAC ductwork routing, sizing and supports.
- Check that penetrations are properly sealed and fire-stopped.
- Confirm fixtures and equipment locations match drawings.
- Inspect for code clearances and accessibility before cover-up.
Insulation and envelope
- Verify insulation type and R-value meet specifications.
- Check vapor barriers and air sealing for continuity.
- Inspect window and door flashing and weatherproofing.
- Confirm exterior cladding installation and fastening.
- Check roofing materials, underlayment and flashing.
- Verify drainage planes and weep paths are clear.
Interior finishes
- Inspect drywall finish, seams and surface quality.
- Check paint coverage, color and edges.
- Verify flooring installation, levelness and transitions.
- Inspect cabinetry, millwork and trim alignment.
- Confirm fixtures, hardware and accessories are installed correctly.
- Check tile layout, grout lines and waterproofing.
Final and systems verification
- Test electrical outlets, switches and GFCI protection.
- Confirm plumbing fixtures operate without leaks.
- Verify HVAC heating, cooling and airflow performance.
- Check that life-safety and fire systems function correctly.
- Review the punch list and confirm corrections are complete.
- Document findings with photos and a signed inspection report.